Sign in
Overview
Files waiting to be filed
Uploaded or signed off by a contractor, kept here, and not in the job's 05 Records yet. Retry checks the job's folder again before writing anything.
Needs attention
Database backups
Quick actions
Projects
Every folder in the Active jobs folder in Drive is a job here. To add one, make its folder in Active, then read Drive again.
Open a project to manage its per-job settings — hub link + QR, Site Snapshot door card, file-mapping overrides, and the tablets assigned to it.
Hub card addresses
These cards have no real address yet, so they read "Link not set up yet" on every job. Enter a card's address and it opens that address on every job. Only an https address can be saved. Clear it and the card goes back to "Link not set up yet".
Buildings
A building holds the shared, site-facing Site Snapshot (access, parking, risers, hours, building manager). Projects in the same building inherit it. No owner/customer details are stored here.
Contractors
Add a contractor to text them a personal “Update progress” link — no login, phone-first. The link shows all their jobs; they tap a task and log where they got to (25% · 50% · 75% · Complete · Blocked · No work today). Tasks come from the schedule (GanttPRO); this link only lets them report.
Copy or text this to the contractor. Lost it? Press Show personal link on their row below — it’s the same link, so nothing changes for them.
Roles on each job’s schedule
Read from each job’s own GanttPRO schedule. Put a name, mobile and email (optional) against a role and Save — that links the person to the role, the same as picking it above, so their reminders and tasks follow. Nothing is changed in GanttPRO.
Tablets
A physical door tablet is paired once and then assigned to a job from here — no need to
re-point it in person when it moves between properties. Its kiosk Start URL never changes;
reassign it below and it switches to the new job on its own. Open /t on a new tablet to get a
6-digit code, then pair it here.
Set this as the tablet’s Fully Kiosk Start URL — it never changes. The tablet also opens it automatically.
Nudges & compliance
The nudge is the feedback: a 7pm text means you didn’t mark off. Compliance = silence — anyone who marked off (including Blocked / No work today) is never messaged. Messages are dry-run (recorded to the outbox below, not sent) unless an SMS provider is switched on — the schedule line below names it. Every message is in the outbox either way. This replaces the old Daily Site Update form. Contractor ticks are staged behind a write-back switch (below); certificate uploads are out of scope.
Weekend texts Off
The automatic texts — the 7am and 7pm texts, ready-for-you texts, the Blocked alert and the evening Tonight text — do not go on Saturdays or Sundays (NZ time) unless this is on. A text that would have gone at the weekend is skipped, not saved for Monday: Monday's 7am text lists that day's work and anything still to mark off, a ready-for-you notice still shows on the person's link, and a Blocked report stays on the Tonight list. Texts you send by hand (Run 7pm/7am check, Send coming up, Test texts) are not affected.
Holiday texts Off
The same automatic texts do not go on NZ public holidays unless this is on: New Year, Waitangi, Easter, Anzac, King's Birthday, Matariki, Labour Day, Christmas and Boxing Day — on the day they are taken when they fall at a weekend (Christmas on a Saturday is taken on the Monday) — and Auckland Anniversary. A text that would have gone on a holiday is skipped, not saved for the next working day, just like at the weekend. This switch is separate from Weekend texts: turning weekend texts on does not turn holiday texts on. Texts you send by hand are not affected.
Text preview
Exactly what the 7pm and 7am checks would generate for today, straight from live records — the same recipients, timing, and wording a real send would use. This page is read-only: no send button, no provider setting, no outbox. If sending is ever switched on, that is a separate, deliberate change.
Sent texts
Every text the automated system really sent, newest first, in NZ time. Test texts, previews, dry runs and texts sent while test mode was on are not shown. accepted means TNZ took the text; delivered or failed shows only once TNZ reports back.
Variation Requests
Every Variation Request a contractor has submitted from a job page, newest first. Read-only — review and sign-off stay in EEQ's own system. Tap a photo to see it larger; Download saves any attached file to enter it there.
Ours or subcontractor
Our own staff can be moved around to even out the work. Subcontractors' dates are protected. A role nobody has picked counts as a subcontractor. A click saves straight away.
Days a subcontractor can't work
Per person, covering every role they hold. The evening list flags any task booked on one of these days. Past dates drop off on their own.
Rules
Days are working days. Times are New Zealand time, 24-hour.
Weekly GanttPRO check
GanttPRO's API is still in beta. Once a week the Hub makes two linked test tasks on the sandbox chart, moves one, checks the other followed it onto the right working day, then deletes both. It never touches a real job. A failure shows on the Tonight list and in the evening text.
Tonight
Planned vs actual
What each task was planned to take against what it really took. Planned is the plan in GanttPRO now; the original plan (the original estimate, or the first plan the Hub recorded) shows under it wherever the two differ. Actuals come from what the Hub has recorded: the nightly copies, the contractors' reports and Completes, and the time they added ("Running late?"). Hours are working hours on each job's own GanttPRO working day. Nothing here changes a date.
Reschedule
Move one task to a new day. The Hub shows a few ways to re-plan every active job around it, as a timeline. Preview only: nothing here changes GanttPRO — a plan you save is kept in the Hub, for the office to put into GanttPRO by hand.
What every option keeps to
All jobs
Every active job’s tasks still to do, as GanttPRO was last read: scroll sideways through the days and down through the jobs, each in its own colour. Pick one or more people or roles to see everything they are on across every job — where they overlap another job it is hatched in yellow. Read only: nothing here changes GanttPRO.
Loading…
Daily schedule check
Each morning the Hub looks over today and the next 8 weeks of every linked schedule, as GanttPRO was last read, for someone on two jobs at the same time, work planned on a public holiday, and open tasks with nobody assigned. It also looks at every open task, however far off, for ones with nothing linked into them. It only reads: nothing changes in GanttPRO, and no one is texted or emailed.
Loading…
Add a trial project
See what another job would do to the plan: this copies the template’s or a job’s tasks, lengths, links, roles and handover, shifted to a new start.
Any admin can open a saved trial on any device. Save trial under a new name keeps a new one; Rename changes the name of the one picked above.
Move a task
-
1
-
2
-
3
Keep some tasks where they are (optional)
A ticked task keeps its dates in every option. Tasks already started always do. Milestones start ticked: untick one to let it move. Ticks are saved with the plan.
What can’t move
A pinned task keeps its dates in every option, and the options are worked out again after each change. Freezing days holds every live task touching them; a trial stays free.
Test mode Off
While test mode is on, every real text run — the 7am and 7pm texts, ready-for-you texts, the Blocked alert and the evening Tonight text — goes to the test number below instead of the real people, through TNZ. Each text starts with a line saying who it would have gone to. The real people get nothing. A run handled in test mode counts as done: turning test mode off does not send it again. Emails go to the test email address instead (email is not sending yet, so they are recorded only).
Send a test text
Sends one text to this number only, through TNZ — even while the live switch is off. Nobody else is texted and nothing is marked as sent. Preview it first.
Pretend it is…
Pick a day to see every text the hub would send that day — the 7am and 7pm texts, ready-for-you texts, Blocked alerts and the evening Tonight text — and every email — the Blocked alert email, the Tonight summary and the GanttPRO check failure — or just one type, from the real schedule and contacts. Nothing is sent and nothing is marked as done. You can then send any of them — or all — to a test number or test email address, marked TEST. Email is not sending yet: a test email is recorded in the email log, not delivered.
Test sends
Every test text, from this tab or a run in test mode. Numbers show their last 3 digits only.
Email notifications
Who gets each kind of email the hub sends. Until a way of sending email is chosen, every email below is kept in the email log at the bottom of this page and delivered to nobody. The texts are not changed by anything here.
Email log
Every email the hub would have sent, newest first — recorded only.